Utica-Midtown Corridor
Utica Midtown Corridor Small Area Plan
Adopted in 2014, the Utica Midtown Corridor Small Area Plan identified 158 implementation measures (52 measures were identified for the north portion, 96 measures were identified for the south portion of the plan area, while ten measures were identified as common elements). As of July 1, 2022, about 62% of those implementation measures are complete or ongoing.